www.geo-tekno.com

 
Let's realize your dream together

 

 

 

 

BAK AMBALAJ * İZMİR 2018

 

EK BAK binası mekanik işleri; yeni tesisin makine ekipman demontaj ve montajları, ısıtma-soğutma, hava hatları, havalandırma kanalları imalat ve montajları tamamlanmıştır.

 

TUBORG * İZMİR 2018

 

Manufacturing and installation works of a total of 3,875 m 10 stainless steel process lines at various diameters were carried out.

 

BİLLUR TUZ * İZMİR 2018

 

Approximately 85 m2 rusted natural gas lines have been revised andreplaced.

 

MONDİ * İZMİR 2018

 

The manufacturing and installation of an additional 30 m PE pipe line with the same diameter as the one obtained from the Ø315 mm PE pipe line with the treatment pool was completed.

 

TARİŞ İNCİR TARIM KOOP. BİRLİĞİ * İZMİR 2018

 

The existing İzmir cologne production facility has been moved to Aydın Ortaklar Sanayi Bölgesi. The process design of the plant was made by GEO. Installation of 18 stainless steel cologne production tanks with capacities of 0.5-30 tonnes, manufacture and installation of stainless steel process lines, design and installation of automation system has been done and the facility has been delivered as turn-key.

 

 

BUNGE GIDA SAN. TİC. A. Ş. * İZMİR 2017-2018

 

The Hexane plant at Aliağa plant has been modified by replacing the carbon steel hexane line pipes and manufacturing and assembly works of stainless steel AISI 304 stainless steel pipes instead. 1 existing carbon steel solvent separator tank is also replaced with a stainless steel solvent seperator tank.

 

BAK AMBALAJ SANAYİ ve TİCARET A.Ş * İZMİR 2017

 

· Production and installation of solvent channels have been completed in the BAK 1 and BAK 2 factories.
 
· With the completion of the work, the solvent vapor that is being thrown from the chimneys to the atmosfere and the solvent recycling facility project to be installed by Geo have been completed.

 

OMYA MADENCİLİK SAN. TİC. A.Ş. * İZMİR 2016

 

The mechanical installation, piping and machine installation work related to the process has been completed.

FELDA IFFCO * İZMİR 2016

 

Construction of hygienic stainless installations as part of margarine, oil production and renewal of energy lines.

FELDA IFFCO * İZMİR 2015

 

Margarine production plant projecting, manufacturing, erection together with reactor installations and shades.

SÜTAŞ A.Ş. Yeni Fabrika Yatırımı * İZMİR 2015

 

Within the scope of the project which started in the second half of 2015, natural gas facilities and installations were completed in our project and contracting teams in Tire - İZMİR new factory investment.

 

 

FELDA IFFCO * İZMİR 2015

 
1. Margarine production plant steam generator projecting, manufacturing, installation and commissioning works have been completed.
 
2. Project and montage of new margarine stainless steel lines and equipments

 

PAKGIDA SANAYİ VE TİCARET A.Ş. * İZMİR 2015

 

Within the scope of the project which started in the second half of 2015, various installation systems and stainless installations from Kemalpaşa-İZMİR factory have been renewed to our projects and contracting teams in accordance with hygiene and food codes.

 

TUKAŞ GIDA SANAYİ VE TİCARET A.Ş. * İZMİR 2015

 
Within the scope of the project that lasted one hundred and eighty days, steam boilers were removed from the Tukas factory in Turgutlu and moved to the factory in Torbalı, and the installation systems and chimney assemblies were completed.
 
 
In the boiler room, 4 steam boiler pumps, water softening systems, pipe fittings were renewed, collectors were manufactured and assembled.
 
 
2800m DN 50 - DN 350 pipes for various steam, air and water and soft water, cooling and tower water lines, evaporator and paste pasteurization lines were projected and assembled including valve equipment. 2 pipe bridges of 18 m and 22 m in length were produced and assembled. After the completion of the boring process, machine connections have been made and tested and operated.
 
 
Renewal of gas control lines for boiler room gas pipeline revision and boilers transported from Turgutlu factory, revisions were made to increase station capacity.
 

 

OMYA MADENCİLİK SAN. A. Ş. * İZMİR 2014

KOSBİ's new factory investment and whole plant fire system has been projected with "fire regulations" together with pump systems, fire cabinets and installations, manufacturing and installation works are continuing.

 

BOZZETTO KİMYA SAN. VE TİC. A.Ş. * İZMİR 2014

350 m, 2 ", 316 L quality stainless steel piping, and steam, hot water and cold water lines with dimentions between 300 m 2" - 8" were manufactured and installed.

 

OMYA MADENCİLİK SAN. A. Ş. * İZMİR 2014

The new factory investment in Kemalpaşa OSB and the whole fire systems of the plant, pump systems, fire cabinets manufacturing and installation work has been completed.

ALTINYAĞ KOMBİNALARI A.Ş. * İZMİR 2014

Within the scope of the project to be realized at Altınyağ facilities, the serpentine pipes of 3 oil tanks will be replaced. Assembly and commissioning are planned to be completed within 1 month.

 

YARIŞ KABİN SAN. A.Ş. *BALIKESİR 2012 -2013

In Organized Region Factory ;

  • New plant  fire fighting system design and engineering, procurement, installation with automation  and commissioning . 

  • New plant radiant heat tube system design and installation , engineering, procurement, installation with automation and commissioning . 

  • Existing plant , dye painting and drying furnace natural gas piping and burner design and installation.

 

 

ÇEŞİTLİ FİRMALAR *İZMİR 2012-2013

New Investments of various companies in energy efficiency , energy recovery and production efficiency instrumentation and monitoring systems ,  fire fighting systems natural gas piping – gas regulation system design and engineering, procurement, installation and commissioning

 

  • BTM A.Ş                                Kemalpaşa-İZMİR  2013
  • COMPONENTA  A.Ş           Manisa OSB 2013
  • ÇUKUROVA  A.Ş                 Manisa OSB 2013
  • KANSAİ ALTAN  A.Ş           Kemalpaşa- İZMİR  2013
  • ESBAŞ  A.Ş                             Gaziemir-İZMİR  2013
  • EGE GÜBRE  A.Ş                  Aliağa-İZMİR  2013
  • POLİNAS  A.Ş                        Manisa OSB 2013
  • YÖRSAN A.Ş FAST FOOD  Susurluk – BALIKESİR 2013

ÖZKAN DEMİR ÇELİK SANAYİ A.Ş* İZMİR 2012-2013

  • New plant  steel annealing furnaces natural gas piping – gas regulation system design and engineering, procurement, installation and commissioning . 

  • New plant for capacity increasing and quality improvement of  sand blasting system natural gas piping – gas regulation system design and installation , engineering, procurement, installation and commissioning . 

 

FERRERO MANİSA OS BÖLGESİ * 2012

6,5 km steam, hot water and condensate piping lines, steel pipe bridges and consoles, projecting, manufacturing and on-site installation.

 

OMYA MADENCİLİK SAN .A.Ş. * İZMİR 2011

Within the scope of the project realized in Kemalpaşa facilities;
1. Designing a 250 m3 stainless steel tank and realizing on-site production,
2. Design and manufacture of suitable mixer after calculations according to tank capacity
3. Installation of equipment and, depending on this, process and stainless piping work, the system was successfully commissioned.

 

YARIŞ KABİN SAN. A.Ş. * BALIKESİR 2010 -2011

 

In Organized Region Factory ;

  • New plant  administrative building heating and cooling with VRF systems, air conditioning, heat recovery systems design and engineering, procurement, installation and commissioning .

  • Fire fighting system design and engineering, procurement, installation with automation  and commissioning of whole factory . 

  • New plant boiler house , dye painting and drying furnace natural gas piping and burner design and installation commissioning .

 

ÖZKAN DEMİR ÇELİK SANAYİ A.Ş * İZMİR 2010 -2011

 

  • New steel production plant  whole furnaces and other facilities natural gas piping – gas regulation system design and engineering, procurement, installation and commissioning . 

  • Role mill plant  capacity increasing and quality improvement of  4th furnace  natural gas piping – gas regulation system design and installation , engineering, procurement, installation and commissioning . 

 

KOROZO AMBALAJ SAN. TİC. A.Ş.* İZMİR 2010

 

Solvents piping  and ventilation system design and installation , engineering, procurement, installation and commissioning .

 

BEST ELEKTROMEKANİK SAN. A.Ş. * BALIKESİR 2009

 

Heating and cooling of administrative building with VRF systems, air conditioning, heat recovery, hot water supply through solar energy systems.

 

BEST ELEKTROMEKANİK SAN. A.Ş. * BALIKESİR 2009

 

Day lighting skylight application for interior lighting of  management building, energy supply from hybrid systems including small scale wind turbines and sun tracking PV panels.

 

BEST ELEKTROMEKANİK SAN. A.Ş* BALIKESİR 2009

 

 

BEST CO. started new factory investment at Balikesir Organized Industrial Zone for the production of heavy duty electric transformers.

GEO was elected as the contractor for mechanical installation works of the new investment project. GEO has realized engineering, procurement and installation works for entire mechanical installations i.e. boiler room with 4 boilers, piping works (steam, hot water, kerosene, natural gas, transformer oil etc.), HVAC for factory and personnel utilities, erection of heavy coil dryers and piping workswith automation .

 

AKZO NOBEL KEMİPOL A.Ş * İZMİR 2008

 

AKZO NOBEL KEMIPOL producing various type of paints ad painting material at İzmir Factory.

GEO realized engineering and turnkey delivery of Steam Generator and steam distribution piping with automation for entire factory.

 

OMYA MADENCİLİK SAN. A.Ş * İZMİR 2008

Installation of P & X and Centrifuge units and other equipment within the scope of the project at Kemalpaşa facilities, in addition to process and stainless pipe works and installation of the system,

 

TİRE ORGANİZE SANAYİ BÖLGESİ * İZMİR 2008

 

   Natural Gas Distribution Network, entire infrastructure of Organized Industry Zone was engineered, constructed, commissioned and delivered on turnkey basis.

 

İZBETON A.Ş. * İZMİR 2007

 

GEO realized revision, procurement, installation and commissioning works for Asphalt Factory mechanical installations and piping, bitumen transfer lines and 6 new boiler rooms with automation and fire protection system.

 

BEST ELEKTROMEKANİK A.Ş *BALIKESİR 2007

 

GEO realized design, procurement, installation and commissioning of entire mechanical piping of factory, establishment of boiler house with automation , heating and cooling systems for various factory sections and personnel facilities , specifically HVAC system of Research and Development Center and Testing Laboratories.

 

ALCAN PACKAGING A.Ş * İZMİR 2007

 

GEO realized engineering, procurement, installation and commissioning of HVAC for new management building and cooling and ventilation duct work installation for two new package production lines together with automation and SCADA system.

 

TUKAŞ GIDA SAN. A.Ş MANYAS TESİSLERİ * BALIKESİR 2007

 

Turnkey Natural Gas installation and piping works i.e. Revision of RMS-Type B Pressure Reduction and Measuring Station, natural gas distribution pipe lines for entire Tomato Past Factory.

 

NATO GENERAL V. AKIN GARNİZONU * İZMİR 2006

Main building VRV type air conditioning and ventilation system,

revision of heating center with additional boilers and burners, engineering,

procurement, installation with automation and commissioning.

TAT KONSERVE SAN A.Ş. * BURSA 2006

Engineering, procurement, installation and commissioning of natural gas system for entire factory

 

TAMSA SERAMİK A.Ş. TORBALI TESİSLERİ * İZMİR 2006

 

Engineering, procurement, installation and commissioning  of natural gas installations for new process units.

 

NATO SATCOM TESİSLERİ * İZMİR 2006

Water treatment plant engineering, procurement, installation and commissioning

DELPHI OTOMOTIV SİSTEMLERİ A.Ş * İZMİR 2006

 

   Engineering, procurement, installation and commissioning 

    of ventilation system for EUCD PUR area.

 

 

PHILIP MORRIS A.Ş * İZMİR 2005

 

Vacuum lines and pumping station engineering, procurement, installation and commissioning.

 

NATO ŞİRİNYER KARARGÂHI * İZMİR 2005

Firefighting piping network and fire pumping station,  engineering, procurement, installation and commissioning.

ESBAŞ * İZMİR 2005

Natural Gas Distribution Network, entire infrastructure of Aegean Free Zone was engineered, constructed, commissioned and delivered on turnkey basis.

 

KLİMASAN KLİMA SAN. VE TİC. A.Ş * İZMİR 2005

 
  Boiler room design, procurement, installation with automation and commissioning.

 

IMPERIAL TÜTÜN A.Ş.* MANİSA 2005

Vacuum lines and pumping station design, procurement, installation and commissioning.

 

YARIŞ KABİN SAN. VE TİC. A.Ş.* BALIKESİR 2005

 
  Boiler room and natural gas lines, engineering, procurement, installation with automation and commissioning .

 

ENERCON AERO RÜZGÂR ENERJİSİ A.Ş * İZMİR 2005

Boiler room design, procurement, installation with automation and commissioning

 

EGE ENDÜSTRİ SAN. A.Ş* İZMİR 2005

Boiler room design, procurement, installation and commissioning

 

TUKAŞ SAN. A.Ş TURGUTLU TESİSLERİ * MANİSA 2005

Natural Gas distribution lines for entire factory design, procurement, installation and commissioning.

 

ÖZKAN DEMİR ÇELİK SAN. A.Ş * İZMİR 2004

Natural gas distribution lines for entire factory design, procurement, installation and commissioning.

 

SAKIPAĞA SGS GIDA SANAYİ VE TİC. A.Ş * İZMİR 2004

Steam lines design, procurement, installation and commissioning.

 

DYO BOYA FABRİKALARI SAN. VE TİC. A.Ş * İZMİR 2004

Fire extinguishing pipe lines design,  procurement, installation and commissioning

 

İNCİ EXCİDE AKÜ SAN. A.Ş * İZMİR 2004

HVAC and air filtration lines for production zones design, procurement, installation and commissioning.

 

HUGO BOSS * İZMİR 2004

Design, procurement, installation and  commissioning of natural gas lines, C-type 2000Nm3/h RMS.
LPG mixer unit – scada unit procurement and installation to supply continuous energy if natural gas stops

INDESIT CO. * MANİSA 2003

 
  Boiler rooms and natural gas pipelines of entire factory, engineering, procurement, installation and commissioning

 

BOSCH ISITMA ÜRÜNLERİ A.Ş. * MANİSA 2003

Design, procurement, installation and commissioning of natural gas lines for entire factory

 

BIANCHI BİSİKLET ENDÜSTRİ A.Ş * MANİSA 2003

Design, procurement, installation and  commissioning of natural gas lines and burners for entire factory.

YÖRSAN GIDA SÜT ENDÜSTRİ A.Ş * BALIKESİR 2003

Design and purchase of steam boiler and natural gas pipeline projects and assemblies.

TAT KONSERVE SAN A.Ş. * BALIKESİR 2003

Design, procurement, installation and commissioning of high pressure natural gas lines and boiler –burner systems and automation of gas  supply and monitoring equipments for entire factory.

 

TAMSA SERAMİK A.Ş. TORBALI TESİSLERİ * İZMİR 2002

Design, procurement, installation and commissioning of natural gas lines for entire factory, and lpg mixer unit – scada installation to supply continuous energy if natural gas stops .

 

NATO MERKEZ YERLEŞKESİ * İZMİR 2001

Water boiler, water softening unit water pumping  station procurement and installation with automation.

 

NATO SATCOM TESİSLERİ * İZMİR 2001

Water boiler, Sun energy water heating system procurement and installation with automation .

 

HENKEL TURYAĞ *İZMİR 2000

Hot and clean air fans, ai2 ducting with 2 MW air heater, steam heat recovery heat exchanger and heating and ventilation of powder detergent section; engineering, procurement, installation and commissioning.

 

ROBERT BOSCH A.Ş. * BURSA 1999

 
  3 MW Superheated water boiler system engineering, procurement, installation and commissioning with automation.

 

ROBERT BOSCH A.Ş * BURSA 1999

3 MW additional hot water boiler and project system and installation of the entire system

EREĞLİ DEMİRÇELİK A.Ş * EREĞLİ/ZONGULDAK 1998

Erdemir No. 4 lime kiln natural gas conversion project Installation of Pressure Reduction Station

 

BOSCH FREN SİSTEMLERİ A.Ş * BURSA 1997

800.000 kcal / h hot oil burner, double fuel (natural gas + fuel oil) burner supply and installation

ROBERT BOSCH A.Ş. * BURSA 1995

Re-construction of 6 MW hot water boiler, turnkey project, installation and operation of double fueled (natural gas and motor) boiler system and auxiliary plants

 

AMCOR AMBALAJ A.Ş İZMİR

 

New administrative buildings, new and existing packaging lines in production halls, machinery special ventilation and air conditioning projects, manufacturing and installation, automation and scada system.

 

 

BEST ELEKTROMEKANİK A.Ş ÜRETİM TESİSLERİ BALIKESİR

 

All mechanical installation and assembly works of transformer production facilities newly established in Balıkesir Organize Sanayi Bölgesi were made as turn key.
• All mechanical installations, boiler rooms
• Heating-cooling, oil and compressed air systems
• Special air conditioning and ventilation systems for the arge and test halls
• Fire systems
• Manufacturing and installation of oven and boiler systems
• Kerosene and oil tank systems
• Kerosene and oil tank systems
• Coil winding ventilation systems
• Central administration building comfort heating, air conditioning and ventilation systems
• Project construction, installation, manufacturing and installation, and SCADA systems.
• In addition, projects and productions of special renewable energy systems (Wind - Solar - Natural light) have been realized.
Work delivery process In parallel with the commissioning of the transformer production facility, a misstep was passed between February and May 2009. We are working in the direction of additional investments.

 

BEST ELEKTROMEKANİK A.Ş YÖNETİM BLOĞU BALIKESİR

 

Best Elektromekanik San. Inc. Installation of Wind Turbine and Photovoltaic Piller from Renewable Energy Sources has been completed in Organize Industrial Zone Facilities Management Block. With the automation system installed, the amount of energy produced in the hybrid system has begun to be read. In addition, the management block rooms were started to be energized without electricity by "Natural Light Lighting Fixtures".
 
In the management block, the use of water system, fire system, VRF system, air conditioning, conference room air conditioning, ventilation system, shelter ventilation and building hot water system were completed and put into operation.

 

2013 GEO Engineering All Rights Reserved ®