BEST ELECTROMECHANICAL INDUSTRY CO. BALIKESIR
BEST CO. started a new factory investment at Balıkesir Organized Industrial Zone for the production of heavy duty electric transformers. GEO was elected as the turn-key contractor for mechanical installation works of the new investment project.
• GEO has realized engineering, procurement and installation works for entire mechanical installations
• I.e. boiler room with 4 boilers,
• piping works (steam, hot water, kerosene, natural gas, transformer oil etc.),
• HVAC for factory and personel utilities, erection of heavy coil dryers and piping workswith automation
• Research and Test Laboratories HVAC Systems
• Besides the Design and procurement of Renewable Energy Systems of the new Plant.
• I.e. boiler room with 4 boilers,
• piping works (steam, hot water, kerosene, natural gas, transformer oil etc.),
• HVAC for factory and personel utilities, erection of heavy coil dryers and piping workswith automation
• Research and Test Laboratories HVAC Systems
• Besides the Design and procurement of Renewable Energy Systems of the new Plant.
BIOGAS PROJECTS OF XERGI
Turnkey Projects
Powerplant Projects
Infrastructure Projects
Special Process Projects
Boiler House Projects
Mechanical Installation Projects
Natural Gas Projects
Renewable Enery Projects
Special Design Projects